Fields / 7220/6-1
7220/6-1
Exploration, wildcatPlugged and abandonedOil shows
Drilled by Norsk Hydro Produksjon AS with Eirik Raude, 20.01.2005 to 29.03.2005 (68 days), to 1 540,0 m in the Basement.
Water depth368,0 m
Total depth1 540,0 m MD
Vertical depth1 540,0 m TVD
Bottom-hole temperature46 °C
Max inclination1,4°
Rotary table25,0 m
Formation at total depthBasement
RigEirik Raude
Spud20.01.2005
Completed29.03.2005
OperatorNorsk Hydro Produksjon AS
Position72,5535 N, 20,9908 E
Formations
7 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 46 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 7220/6-2 | 2,0 | 985,0 | - | 1,50 | 2015 |
| 7220/6-2 R | 2,0 | 1 318,0 | - | 1,16 | 2016 |
| 7221/4-1 | 11,6 | 1 570,0 | - | 1,39 | 2020 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 391,0 | 36" | - | - |
| Conductor | 30" | 454,0 | 36" | 454,0 | - |
| Surface casing | 20" | 476,0 | 26" | 479,0 | 1,15 LOT |
| Intermediate | 13 3/8" | 543,0 | 17 1/2" | 546,0 | 1,39 LOT |
| Intermediate | 9 5/8" | 1 124,0 | 12 1/4" | 1 130,0 | 2,05 LOT |
| Open hole | - | 1 540,0 | 8 1/2" | 1 540,0 | - |
Mud weight
9 measurements, one dot each, 1,00 to 1,21 g/cm³ against measured depth, water based.