WellplannerNorwegian shelf well data

Fields / Johan Castberg / 7220/7-4

7220/7-4

Exploration, wildcatPlugged and abandonedOil

Drilled by Equinor Energy AS with Transocean Enabler in Johan Castberg, 07.02.2021 to 14.03.2021 (35 days), to 2 112,0 m in the Tubåen Formation.

Water depth351,0 m
Total depth2 112,0 m MD
Vertical depth2 111,0 m TVD
Bottom-hole temperature73 °C
Max inclination3,1°
Rotary table32,0 m
Formation at total depthTubåen Formation
RigTransocean Enabler
Spud07.02.2021
Completed14.03.2021
OperatorEquinor Energy AS
Position72,4179 N, 20,1405 E

Formations

13 tops reported, measured depth in metres.

GroupsNordland Group, top 383,0 mNordland GpSotbakken Group, top 468,0 mSotbakken GpAdventdalen Group, top 1 219,0 mAdventdalen GpKapp Toscana Group, top 1 820,3 mKapp Toscana GpFormationsNaust Formation, top 383,0 mNaust FmTorsk Formation, top 468,0 mTorsk FmKolmule Formation, top 1 219,0 mKolmule FmKolje Formation, top 1 578,0 mKolje FmKnurr Formation, top 1 707,0 mFuglen Formation, top 1 762,0 mFuglen FmStø Formation, top 1 820,3 mStø FmNordmela Formation, top 1 890,2 mNordmela FmTubåen Formation, top 2 061,0 m3835001 0001 5002 0002 112

Temperature

Reported at total depth73 °C
Johan Castberg gradient37,3 °C/km
Estimated at total depth from the gradient68 °C

The gradient is the median of 3 released wells in Johan Castberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
7220/7-3 S1,72 097,0-1,232014
7220/7-CD-1 AH2,32 166,0--2025
7220/7-CD-1 H2,32 324,0--2025
7220/7-CB-3 H2,62 825,0--2021
7220/7-CB-2 H2,74 047,0--2021
7220/7-CB-4 H2,74 420,0--2021
7220/7-CB-1 Y1H2,73 795,0--2025
7220/7-CB-1 Y2H2,73 640,0--2025

Casing and formation tests

The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.

StringCasingShoe, mHoleHole depth, mTest, g/cm³
Conductor30"433,936"436,0-
Intermediate13 3/8"1 263,817 1/2"1 272,01,35 FIT
Intermediate9 5/8"1 708,012 1/4"1 710,01,50 FIT
Open hole-2 112,08 1/2"2 112,0-

Mud weight

18 measurements, one dot each, 1,10 to 1,30 g/cm³ against measured depth, barahib eco, brine/polymer mud, kcl/polymer/gem.

1,11,21,305001 0001 5002 000383,0 m: 1,30 g/cm³, KCl/Polymer/GEM600,0 m: 1,21 g/cm³, KCl/Polymer/GEM1 133,0 m: 1,30 g/cm³, Brine/Polymer mud1 272,0 m: 1,21 g/cm³, KCl/Polymer/GEM1 293,0 m: 1,13 g/cm³, BaraHib ECO1 350,0 m: 1,24 g/cm³, BaraHib ECO1 435,0 m: 1,13 g/cm³, BaraHib ECO1 607,0 m: 1,24 g/cm³, BaraHib ECO1 702,0 m: 1,14 g/cm³, BaraHib ECO1 710,0 m: 1,20 g/cm³, BaraHib ECO1 912,0 m: 1,24 g/cm³, BaraHib ECO1 912,0 m: 1,22 g/cm³, BaraHib ECO1 958,0 m: 1,22 g/cm³, BaraHib ECO1 985,0 m: 1,20 g/cm³, BaraHib ECO1 985,0 m: 1,22 g/cm³, BaraHib ECO1 985,0 m: 1,21 g/cm³, BaraHib ECO2 028,0 m: 1,20 g/cm³, BaraHib ECO2 112,0 m: 1,20 g/cm³, BaraHib ECO
Show on the mapOpen on FactPages ↗