Fields / 7220/7-5
7220/7-5
Exploration, wildcatPluggedOil and gas
Drilled by Equinor Energy AS with COSLProspector, 20.02.2026 to 17.03.2026 (25 days), to 1 145,0 m.
Water depth335,0 m
Total depth1 145,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table26,1 m
Formation at total depth-
RigCOSLProspector
Spud20.02.2026
Completed17.03.2026
OperatorEquinor Energy AS
Position72,3668 N, 20,1233 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 7220/7-CC-3 H | 2,6 | - | - | - | - |
| 7220/7-CC-4 Y1H | 2,6 | - | - | - | - |
| 7220/7-CC-4 Y2H | 2,6 | - | - | - | - |
| 7220/7-CC-1 Y1H | 2,6 | - | - | - | - |
| 7220/7-CC-1 Y2H | 2,6 | - | - | - | - |
| 7220/7-CD-1 AH | 3,4 | 2 166,0 | - | - | 2025 |
| 7220/7-CD-1 H | 3,4 | 2 324,0 | - | - | 2025 |
| 7220/7-3 S | 4,0 | 2 097,0 | - | 1,23 | 2014 |
Casing and formation tests
No casing programme is reported for this wellbore.