Fields / Johan Castberg / 7220/7-CA-4 Y1H
7220/7-CA-4 Y1H
Development, productionClosed
Drilled by Equinor Energy AS with Transocean Enabler in Johan Castberg, 24.04.2021 to 20.12.2025 (1701 days), to 3 854,0 m.
Water depth365,7 m
Total depth3 854,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table32,1 m
Formation at total depth-
RigTransocean Enabler
Spud24.04.2021
Completed20.12.2025
OperatorEquinor Energy AS
Position72,4536 N, 20,1505 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Johan Castberg gradient | 37,3 °C/km |
| Estimated at total depth from the gradient | 133 °C |
The gradient is the median of 3 released wells in Johan Castberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 7220/7-CA-4 Y2H same well | 0,0 | 4 081,0 | - | - | 2025 |
| 7220/7-CA-1 Y1H | 0,0 | 4 394,0 | - | - | 2021 |
| 7220/7-CA-1 Y2H | 0,0 | 4 705,0 | - | - | 2021 |
| 7220/7-CA-2 H | 0,0 | 2 356,0 | - | - | 2021 |
| 7220/7-1 | 0,8 | 2 230,0 | 72 °C | 1,39 | 2011 |
| 7220/7-U-1 | 1,0 | 1 050,0 | - | - | 2011 |
| 7220/7-CB-1 Y1H | 1,4 | 3 795,0 | - | - | 2025 |
| 7220/7-CB-1 Y2H | 1,4 | 3 640,0 | - | - | 2025 |
Casing and formation tests
No casing programme is reported for this wellbore.