Fields / 7224/6-1
7224/6-1
Exploration, wildcatPlugged and abandonedGas
Drilled by StatoilHydro Petroleum AS with Polar Pioneer, 22.07.2008 to 21.08.2008 (30 days), to 2 338,0 m in the Kobbe Formation.
Water depth266,0 m
Total depth2 338,0 m MD
Vertical depth2 338,0 m TVD
Bottom-hole temperature73 °C
Max inclination1,6°
Rotary table23,0 m
Formation at total depthKobbe Formation
RigPolar Pioneer
Spud22.07.2008
Completed21.08.2008
OperatorStatoilHydro Petroleum AS
Position72,6247 N, 24,9121 E
Formations
12 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 73 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 7224/6-U-1 | 0,0 | 967,0 | - | - | 2008 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 338,0 | 36" | 343,0 | - |
| Surface casing | 20" | 699,0 | 17 1/2" | 706,0 | 1,91 LOT |
| Pilot hole | - | 706,0 | 9 7/8" | 706,0 | - |
| Liner | 9 5/8" | 1 503,0 | 12 1/4" | 1 505,0 | 1,82 LOT |
| Open hole | - | 2 338,0 | 8 1/2" | 2 338,0 | - |
Mud weight
4 measurements, one dot each, 1,00 to 1,30 g/cm³ against measured depth, sw-hi-vi, wmb-gly.