Fields / 7226/2-U-1
7226/2-U-1
Other, shallow gasPlugged and abandoned
Drilled by StatoilHydro ASA with Polar Pioneer, 12.05.2008 to 14.05.2008 (2 days), to 1 121,0 m.
Water depth347,0 m
Total depth1 121,0 m MD
Vertical depth744,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigPolar Pioneer
Spud12.05.2008
Completed14.05.2008
OperatorStatoilHydro ASA
Position72,8922 N, 26,5942 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 7226/2-1 | 0,0 | 2 992,0 | - | 1,54 | 2008 |
Casing and formation tests
No casing programme is reported for this wellbore.