Fields / 7229/11-1
7229/11-1
Exploration, wildcatPlugged and abandonedDry
Drilled by A/S Norske Shell with Ross Rig (2), 09.08.1993 to 15.12.1993 (128 days), to 4 630,0 m in the Ørn Formation.
Water depth284,0 m
Total depth4 630,0 m MD
Vertical depth4 627,7 m TVD
Bottom-hole temperature140 °C
Max inclination4,1°
Rotary table24,0 m
Formation at total depthØrn Formation
RigRoss Rig (2)
Spud09.08.1993
Completed15.12.1993
OperatorA/S Norske Shell
Position72,2159 N, 29,6416 E
Formations
23 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 140 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
No other wellbore lies within 15 km, or the position is not reported.
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 380,0 | 36" | 380,0 | - |
| Surface casing | 20" | 1 085,0 | 26" | 1 085,0 | - |
| Intermediate | 14" | 3 000,0 | 17 1/2" | 3 000,0 | - |
| Open hole | - | 4 630,0 | 12 1/4" | 4 630,0 | - |
Mud weight
76 measurements, one dot each, 1,10 to 1,36 g/cm³ against measured depth, water based.