Fields / 7316/5-1
7316/5-1
Exploration, wildcatPlugged and abandonedGas
Drilled by Norsk Hydro Produksjon AS with Polar Pioneer, 21.07.1992 to 05.10.1992 (76 days), to 4 027,0 m in the Kveite Formation.
Water depth450,0 m
Total depth4 027,0 m MD
Vertical depth4 014,0 m TVD
Bottom-hole temperature183 °C
Max inclination12,5°
Rotary table23,0 m
Formation at total depthKveite Formation
RigPolar Pioneer
Spud21.07.1992
Completed05.10.1992
OperatorNorsk Hydro Produksjon AS
Position73,5200 N, 16,4333 E
Formations
5 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 183 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
No other wellbore lies within 15 km, or the position is not reported.
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 559,0 | 36" | 560,0 | - |
| Intermediate | 18 3/8" | 569,0 | 24" | 569,0 | - |
| Liner | 16" | 877,0 | 24" | 878,0 | 1,66 LOT |
| Intermediate | 9 5/8" | 2 956,0 | 12 1/4" | 2 973,0 | 1,60 LOT |
| Open hole | - | 4 027,0 | 8 1/2" | 4 027,0 | - |
Mud weight
40 measurements, one dot each, 1,00 to 1,50 g/cm³ against measured depth, water based.
Drill-stem tests
Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.
| Test | Interval, m | Choke | Pressure | Temp. | Oil | Gas |
|---|
| 1 | 1 338,0 - 1 350,0 | 25,4 | - | - | - | 563 000 |