Fields / 7321/8-U-1
7321/8-U-1
Other, shallow gasPlugged and abandoned
Drilled by Spirit Energy Norway AS with Leiv Eiriksson, 31.05.2020 to 01.06.2020 (1 days), to 825,0 m.
Water depth466,0 m
Total depth825,0 m MD
Vertical depth825,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table25,0 m
Formation at total depth-
RigLeiv Eiriksson
Spud31.05.2020
Completed01.06.2020
OperatorSpirit Energy Norway AS
Position73,3759 N, 21,5863 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 7321/8-2 S | 0,2 | 1 899,0 | - | - | 2020 |
| 7321/8-1 | 7,0 | 3 482,0 | 108 °C | 1,30 | 1987 |
| 7321/9-1 | 12,3 | 1 800,0 | 44 °C | 1,14 | 1988 |
Casing and formation tests
No casing programme is reported for this wellbore.