Fields / 7324/6-2
7324/6-2
Exploration, wildcatPlugged and abandonedGas
Drilled by Aker BP ASA with Scarabeo 8, 27.05.2024 to 04.07.2024 (38 days), to 1 280,0 m in the Snadd Formation.
Water depth421,4 m
Total depth1 280,0 m MD
Vertical depth1 280,0 m TVD
Bottom-hole temperature38 °C
Max inclination0,9°
Rotary table33,6 m
Formation at total depthSnadd Formation
RigScarabeo 8
Spud27.05.2024
Completed04.07.2024
OperatorAker BP ASA
Position73,5298 N, 24,9688 E
Formations
13 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 38 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 7324/6-1 | 13,6 | 1 600,0 | - | 1,30 | 2019 |
| 7325/4-1 | 14,8 | 1 210,0 | 34 °C | 1,17 | 2017 |
| 7325/4-U-1 | 14,8 | 725,0 | - | - | 2017 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Surface casing | 30" | 504,4 | 36" | 507,0 | 1,74 FIT |
| Intermediate | 9 5/8" | 798,9 | 12 1/4" | 803,0 | - |
| Open hole | - | 1 280,0 | 8 1/2" | 1 280,0 | - |
Mud weight
5 measurements, one dot each, 1,00 to 1,14 g/cm³ against measured depth, water.