Fields / 8/1-1
8/1-1
Exploration, wildcatPlugged and abandonedDry
Drilled by Phillips Petroleum Company Norway with Ocean Tide, 02.12.1971 to 07.02.1972 (67 days), to 2 971,0 m in the Zechstein Group.
Water depth67,0 m
Total depth2 971,0 m MD
Vertical depth-
Bottom-hole temperature101 °C
Max inclination5,0°
Rotary table31,0 m
Formation at total depthZechstein Group
RigOcean Tide
Spud02.12.1971
Completed07.02.1972
OperatorPhillips Petroleum Company Norway
Position57,8626 N, 3,2077 E
Formations
28 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 101 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
No other wellbore lies within 15 km, or the position is not reported.
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 132,0 | 36" | 135,0 | - |
| Surface casing | 13 3/8" | 469,0 | 17 1/2" | 488,0 | - |
| Intermediate | 9 5/8" | 1 515,0 | 12 1/4" | 1 525,0 | - |
| Open hole | - | 2 971,0 | 8 1/2" | 2 971,0 | - |
Mud weight
4 measurements, one dot each, 1,20 to 1,33 g/cm³ against measured depth, seawater, waterbased.