Fields / 9/11-1
9/11-1
Exploration, wildcatPlugged and abandonedShows
Drilled by Conoco Norway Inc. with Transworld Rig61, 03.07.1971 to 19.08.1971 (47 days), to 2 196,0 m in the Skagerrak Formation.
Water depth65,0 m
Total depth2 196,0 m MD
Vertical depth-
Bottom-hole temperature68 °C
Max inclination-
Rotary table25,0 m
Formation at total depthSkagerrak Formation
RigTransworld Rig61
Spud03.07.1971
Completed19.08.1971
OperatorConoco Norway Inc.
Position57,0115 N, 4,5279 E
Formations
25 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 68 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
No other wellbore lies within 15 km, or the position is not reported.
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 127,0 | 36" | 127,0 | - |
| Intermediate | 20" | 394,0 | 26" | 411,0 | - |
| Intermediate | 13 3/8" | 745,0 | 17 1/2" | 771,0 | - |
| Intermediate | 9 5/8" | 1 589,0 | 12 1/4" | 1 605,0 | - |
| Open hole | - | 2 196,0 | 8 1/2" | 2 196,0 | - |
Mud weight
6 measurements, one dot each, 1,10 to 1,61 g/cm³ against measured depth, waterbased.