9/2-D-1 H
Development, productionClosedOil
Drilled by Talisman Energy Norge AS with Mærsk Guardian in Yme, 20.07.2009 to 03.04.2010 (257 days), to 4 231,0 m.
Water depth95,0 m
Total depth4 231,0 m MD
Vertical depth3 202,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table51,0 m
Formation at total depth-
RigMærsk Guardian
Spud20.07.2009
Completed03.04.2010
OperatorTalisman Energy Norge AS
Position57,7564 N, 4,3688 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Yme gradient | 32,0 °C/km |
| Estimated at total depth from the gradient | 102 °C |
The gradient is the median of 4 released wells in Yme with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.