Fields / 9/4-1
9/4-1
Exploration, wildcatPlugged and abandonedShows
Drilled by Conoco Norway Inc. with Endeavour, 31.03.1968 to 19.05.1968 (49 days), to 2 963,0 m in the Zechstein Group.
Water depth68,0 m
Total depth2 963,0 m MD
Vertical depth-
Bottom-hole temperature75 °C
Max inclination5,2°
Rotary table29,0 m
Formation at total depthZechstein Group
RigEndeavour
Spud31.03.1968
Completed19.05.1968
OperatorConoco Norway Inc.
Position57,5839 N, 4,0203 E
Formations
29 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 75 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 9/4-2 | 11,5 | 3 025,0 | 76 °C | 1,41 | 1970 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 36" | 144,0 | 48" | 146,0 | - |
| Surface casing | 20" | 334,0 | 26" | 335,0 | - |
| Intermediate | 13 3/8" | 1 092,0 | 17 1/2" | 1 094,0 | - |
| Open hole | - | 2 963,0 | 12 1/4" | 2 963,0 | - |
Mud weight
3 measurements, one dot each, 1,00 to 1,25 g/cm³ against measured depth, spersene xp, seawater.