Fields / 9/8-1
9/8-1
Exploration, wildcatPlugged and abandonedOil shows
Drilled by Esso Exploration and Production Norway A/S with Endeavour, 23.05.1968 to 29.06.1968 (37 days), to 2 176,0 m in the Zechstein Group.
Water depth68,0 m
Total depth2 176,0 m MD
Vertical depth-
Bottom-hole temperature75 °C
Max inclination4,0°
Rotary table30,0 m
Formation at total depthZechstein Group
RigEndeavour
Spud23.05.1968
Completed29.06.1968
OperatorEsso Exploration and Production Norway A/S
Position57,3428 N, 4,3369 E
Formations
21 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 75 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
No other wellbore lies within 15 km, or the position is not reported.
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 36" | 138,0 | 48" | 145,0 | - |
| Surface casing | 20" | 360,0 | 26" | 412,0 | - |
| Intermediate | 13 3/8" | 1 265,0 | 17 1/2" | 1 279,0 | - |
| Open hole | - | 2 176,0 | 12 1/4" | 2 176,0 | - |
Mud weight
3 measurements, one dot each, 1,10 to 1,15 g/cm³ against measured depth, seawater, waterbased.