1/3-A-3 H
Development, productionPlugged and abandonedOil
Drilled by DONG E&P Norge AS with Mærsk Giant in Oselvar, 04.03.2012 to 14.05.2012 (71 days), to 6 665,0 m.
Water depth72,0 m
Total depth6 665,0 m MD
Vertical depth3 171,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table45,0 m
Formation at total depth-
RigMærsk Giant
Spud04.03.2012
Completed14.05.2012
OperatorDONG E&P Norge AS
Position56,9320 N, 2,6715 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Oselvar gradient | 41,1 °C/km |
| Estimated at total depth from the gradient | 130 °C |
The gradient is the median of 4 released wells in Oselvar with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.