Fields / 1/3-U-16
1/3-U-16
Other, soil drillingPlugged and abandoned
Drilled by DONG E&P Norge AS with Bucentaur, 30.12.2010 to 31.12.2010 (1 days), to 108,0 m.
Water depth72,2 m
Total depth108,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table3,0 m
Formation at total depth-
RigBucentaur
Spud30.12.2010
Completed31.12.2010
OperatorDONG E&P Norge AS
Position56,9315 N, 2,6712 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.