Fields / 1/6-5
1/6-5
Exploration, wildcatPlugged and abandonedShows
Drilled by Conoco Norway Inc. with Dyvi Stena, 20.07.1990 to 02.09.1990 (44 days), to 1 854,0 m in the Zechstein Group.
Water depth70,0 m
Total depth1 854,0 m MD
Vertical depth1 854,0 m TVD
Bottom-hole temperature104 °C
Max inclination1,7°
Rotary table25,0 m
Formation at total depthZechstein Group
RigDyvi Stena
Spud20.07.1990
Completed02.09.1990
OperatorConoco Norway Inc.
Position56,5393 N, 2,8013 E
Formations
12 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 104 °C |
| Drill-stem test at 1 740,9 m | 98 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 1/6-2 | 4,8 | 3 383,0 | 70 °C | - | 1972 |
| 1/6-7 | 6,5 | 4 995,0 | 182 °C | 2,12 | 1992 |
| 1/6-U-12 | 8,3 | 39,3 | - | - | 2025 |
| 1/6-U-13 | 8,3 | 40,0 | - | - | 2025 |
| 1/6-U-11 | 8,3 | 38,5 | - | - | 2025 |
| 1/6-U-10 | 8,3 | 21,0 | - | - | 2025 |
| 1/6-U-8 | 8,4 | 40,3 | - | - | 2025 |
| 1/6-U-7 | 8,4 | 22,1 | - | - | 2025 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 156,0 | 36" | 156,0 | - |
| Intermediate | 20" | 588,0 | 26" | 600,0 | - |
| Intermediate | 16" | 1 126,0 | 22" | 1 132,0 | 1,42 LOT |
| Intermediate | 9 5/8" | 1 521,0 | 12 1/4" | 1 530,0 | 1,74 LOT |
| Liner | 7" | 1 843,0 | 8 1/2" | 1 854,0 | - |
Mud weight
36 measurements, one dot each, 1,00 to 1,88 g/cm³ against measured depth, water based.
Drill-stem tests
Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.
| Test | Interval, m | Choke | Pressure | Temp. | Oil | Gas |
|---|
| 1 | 1 722,0 - 1 740,9 | 9,5 | - | 98 | - | - |