Fields / Tommeliten A / 1/9-2
1/9-2
Exploration, appraisalPlugged and abandonedOil shows
Drilled by Den norske stats oljeselskap a.s with Ross Rig (1) in Tommeliten A, 01.06.1977 to 12.08.1977 (72 days), to 3 459,0 m in the Hod Formation.
Formations
13 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 121 °C |
| Tommeliten A gradient | 35,8 °C/km |
| Estimated at total depth from the gradient | 124 °C |
The gradient is the median of 5 released wells in Tommeliten A with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 1/9-1 | 1,6 | 3 703,0 | 133 °C | 1,91 | 1976 |
| 1/9-1 R | 1,6 | 3 704,0 | 133 °C | - | 1987 |
| 1/9-AB-1 AH | 2,0 | 5 197,0 | - | - | 2023 |
| 1/9-AB-1 H | 2,0 | 3 981,0 | - | - | 2022 |
| 1/9-AB-2 H | 2,0 | 5 257,0 | - | - | 2023 |
| 1/9-AB-6 H | 2,0 | 5 085,0 | - | - | 2023 |
| 1/9-U-17 | 2,0 | - | - | - | 2020 |
| 1/9-AB-3 AH | 2,0 | 5 549,0 | - | - | 2023 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 153,0 | 36" | 153,0 | - |
| Surface casing | 20" | 433,0 | 26" | 493,0 | - |
| Intermediate | 13 3/8" | 1 375,0 | 17 1/2" | 1 390,0 | - |
| Intermediate | 9 5/8" | 2 856,0 | 12 1/4" | 2 866,0 | - |
| Liner | 7" | 3 458,0 | 8 1/2" | 3 459,0 | - |
Mud weight
7 measurements, one dot each, 1,00 to 1,85 g/cm³ against measured depth, spud mud, waterbased.
Drill-stem tests
Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.
| Test | Interval, m | Choke | Pressure | Temp. | Oil | Gas |
|---|---|---|---|---|---|---|
| 2 | 3 130,0 - 3 154,0 | - | - | - | - | - |
| 1 | 3 197,0 - 3 209,0 | - | - | - | - | - |