WellplannerNorwegian shelf well data

Fields / Tommeliten A / 1/9-2

1/9-2

Exploration, appraisalPlugged and abandonedOil shows

Drilled by Den norske stats oljeselskap a.s with Ross Rig (1) in Tommeliten A, 01.06.1977 to 12.08.1977 (72 days), to 3 459,0 m in the Hod Formation.

Water depth75,0 m
Total depth3 459,0 m MD
Vertical depth-
Bottom-hole temperature121 °C
Max inclination2,2°
Rotary table25,0 m
Formation at total depthHod Formation
RigRoss Rig (1)
Spud01.06.1977
Completed12.08.1977
OperatorDen norske stats oljeselskap a.s
Position56,3980 N, 2,9263 E

Formations

13 tops reported, measured depth in metres.

GroupsNordland Group, top 100,0 mNordland GpHordaland Group, top 1 054,0 mHordaland GpRogaland Group, top 2 928,0 mRogaland GpShetland Group, top 3 120,0 mShetland GpFormationsBalder Formation, top 2 928,0 mSele Formation, top 2 953,0 mLista Formation, top 3 025,5 mAndrew Formation, top 3 030,0 mLista Formation, top 3 033,0 mVåle Formation, top 3 096,0 mEkofisk Formation, top 3 120,0 mTor Formation, top 3 195,0 mTor FmHod Formation, top 3 308,0 mHod Fm1001 0002 0003 0003 459

Temperature

Reported at total depth121 °C
Tommeliten A gradient35,8 °C/km
Estimated at total depth from the gradient124 °C

The gradient is the median of 5 released wells in Tommeliten A with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
1/9-11,63 703,0133 °C1,911976
1/9-1 R1,63 704,0133 °C-1987
1/9-AB-1 AH2,05 197,0--2023
1/9-AB-1 H2,03 981,0--2022
1/9-AB-2 H2,05 257,0--2023
1/9-AB-6 H2,05 085,0--2023
1/9-U-172,0---2020
1/9-AB-3 AH2,05 549,0--2023

Casing and formation tests

The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.

StringCasingShoe, mHoleHole depth, mTest, g/cm³
Conductor30"153,036"153,0-
Surface casing20"433,026"493,0-
Intermediate13 3/8"1 375,017 1/2"1 390,0-
Intermediate9 5/8"2 856,012 1/4"2 866,0-
Liner7"3 458,08 1/2"3 459,0-

Mud weight

7 measurements, one dot each, 1,00 to 1,85 g/cm³ against measured depth, spud mud, waterbased.

1,01,21,41,61,801 0002 0003 000250,0 m: 1,03 g/cm³, spud mud1 155,0 m: 1,29 g/cm³, waterbased1 772,0 m: 1,70 g/cm³, waterbased2 658,0 m: 1,85 g/cm³, waterbased2 867,0 m: 1,67 g/cm³, waterbased3 218,0 m: 1,67 g/cm³, waterbased3 459,0 m: 1,66 g/cm³, waterbased

Drill-stem tests

Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.

TestInterval, mChokePressureTemp.OilGas
23 130,0 - 3 154,0-----
13 197,0 - 3 209,0-----
Show on the mapOpen on FactPages ↗