WellplannerNorwegian shelf well data

Fields / Tommeliten A / 1/9-3 R

1/9-3 R

Exploration, appraisalPlugged and abandonedGas and condensate

Drilled by Den norske stats oljeselskap a.s with Dyvi Beta in Tommeliten A, 27.05.1978 to 30.09.1978 (126 days), to 4 570,0 m in the Haugesund Formation.

Water depth76,5 m
Total depth4 570,0 m MD
Vertical depth4 566,0 m TVD
Bottom-hole temperature-
Max inclination8,3°
Rotary table35,8 m
Formation at total depthHaugesund Formation
RigDyvi Beta
Spud27.05.1978
Completed30.09.1978
OperatorDen norske stats oljeselskap a.s
Position56,4155 N, 2,9042 E

Formations

24 tops reported, measured depth in metres.

GroupsNordland Group, top 111,0 mNordland GpHordaland Group, top 1 150,0 mHordaland GpRogaland Group, top 2 866,0 mRogaland GpShetland Group, top 3 081,0 mShetland GpCromer Knoll Group, top 3 790,0 mCromer Knoll GpTyne Group, top 4 265,0 mTyne GpFormationsNo Formal Name, top 1 617,0 mNo Formal Name, top 1 634,0 mNo Formal Name, top 1 664,0 mNo Formal Name, top 1 683,0 mNo Formal NameBalder Formation, top 2 866,0 mSele Formation, top 2 905,0 mLista Formation, top 2 943,0 mMaureen Formation, top 3 021,0 mEkofisk Formation, top 3 081,0 mTor Formation, top 3 157,0 mTor FmHod Formation, top 3 395,0 mHod FmBlodøks Formation, top 3 651,0 mHidra Formation, top 3 683,0 mRødby Formation, top 3 790,0 mRødby FmMandal Formation, top 4 265,0 mFarsund Formation, top 4 319,0 mEldfisk Formation, top 4 359,5 mHaugesund Formation, top 4 386,5 mHaugesund Fm1111 0002 0003 0004 0004 570

Temperature

Reported at total depth-
Tommeliten A gradient35,8 °C/km
Estimated at total depth from the gradient164 °C

The gradient is the median of 5 released wells in Tommeliten A with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
1/9-3 same well0,02 771,0116 °C1,891977
1/9-U-280,4---2020
1/9-U-40,5---2020
1/9-U-120,5---2020
1/9-U-130,6---2020
1/9-AA-3 H0,65 062,0--2023
1/9-AA-4 H0,65 757,7--2023
1/9-U-30,6---2020

Casing and formation tests

The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.

StringCasingShoe, mHoleHole depth, mTest, g/cm³
Intermediate9 5/8"3 830,012 1/4"3 830,0-
Open hole-4 570,08 1/2"4 570,0-
Show on the mapOpen on FactPages ↗