WellplannerNorwegian shelf well data

Fields / Tommeliten A / 1/9-3

1/9-3

Exploration, appraisalSuspendedDry

Drilled by Den norske stats oljeselskap a.s with Dyvi Gamma in Tommeliten A, 13.08.1977 to 27.11.1977 (106 days), to 2 771,0 m in the Hordaland Group.

Water depth76,5 m
Total depth2 771,0 m MD
Vertical depth2 771,0 m TVD
Bottom-hole temperature116 °C
Max inclination0,8°
Rotary table35,8 m
Formation at total depthHordaland Group
RigDyvi Gamma
Spud13.08.1977
Completed27.11.1977
OperatorDen norske stats oljeselskap a.s
Position56,4155 N, 2,9042 E

Formations

6 tops reported, measured depth in metres.

GroupsNordland Group, top 111,0 mNordland GpHordaland Group, top 1 150,0 mHordaland GpFormationsNo Formal Name, top 1 617,0 mNo Formal Name, top 1 634,0 mNo Formal Name, top 1 664,0 mNo Formal Name, top 1 683,0 mNo Formal Name1115001 0001 5002 0002 5002 771

Temperature

Reported at total depth116 °C
Drill-stem test at 3 112,0 m120 °C
Tommeliten A gradient35,8 °C/km
Estimated at total depth from the gradient99 °C

The gradient is the median of 5 released wells in Tommeliten A with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
1/9-3 R same well0,04 570,0--1978
1/9-U-280,4---2020
1/9-U-40,5---2020
1/9-U-120,5---2020
1/9-U-130,6---2020
1/9-AA-3 H0,65 062,0--2023
1/9-AA-4 H0,65 757,7--2023
1/9-U-30,6---2020

Casing and formation tests

The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.

StringCasingShoe, mHoleHole depth, mTest, g/cm³
Conductor36"163,044"170,0-
Surface casing20"434,026"445,0-
Intermediate16"1 345,019 1/2"1 360,0-
Intermediate13 3/8"2 761,017 1/2"2 782,0-

Mud weight

9 measurements, one dot each, 1,00 to 1,89 g/cm³ against measured depth, gel mud, spud mud.

1,01,21,41,61,805001 0001 5002 0002 500169,0 m: 1,04 g/cm³, spud mud445,0 m: 1,07 g/cm³, spud mud621,0 m: 1,37 g/cm³, gel mud979,0 m: 1,37 g/cm³, gel mud1 313,0 m: 1,41 g/cm³, gel mud1 529,0 m: 1,74 g/cm³, gel mud2 251,0 m: 1,89 g/cm³, gel mud2 448,0 m: 1,85 g/cm³, gel mud2 773,0 m: 1,85 g/cm³, gel mud

Drill-stem tests

Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.

TestInterval, mChokePressureTemp.OilGas
43 094,0 - 3 112,019,0-120397648 400
33 126,0 - 3 125,0-----
23 157,0 - 3 180,09,5--84 800
13 205,0 - 3 214,019,0----
Show on the mapOpen on FactPages ↗