WellplannerNorwegian shelf well data

Fields / Gudrun / 15/3-8

15/3-8

Exploration, appraisalPlugged and abandonedOil and gas

Drilled by Statoil ASA (old) with Transocean Leader in Gudrun, 03.11.2005 to 11.04.2006 (159 days), to 4 592,0 m in the Draupne Formation.

Water depth109,0 m
Total depth4 592,0 m MD
Vertical depth4 591,0 m TVD
Bottom-hole temperature145 °C
Max inclination2,2°
Rotary table23,5 m
Formation at total depthDraupne Formation
RigTransocean Leader
Spud03.11.2005
Completed11.04.2006
OperatorStatoil ASA (old)
Position58,8577 N, 1,7213 E

Formations

27 tops reported, measured depth in metres.

GroupsNordland Group, top 132,5 mNordland GpHordaland Group, top 858,0 mHordaland GpHordaland Group, top 1 136,0 mHordaland GpHordaland Group, top 1 792,0 mHordaland GpRogaland Group, top 2 164,0 mRogaland GpShetland Group, top 2 740,0 mShetland GpCromer Knoll Group, top 3 793,5 mViking Group, top 3 932,5 mViking GpFormationsUtsira Formation, top 658,0 mUtsira FmSkade Formation, top 1 025,0 mSkade FmGrid Formation, top 1 448,0 mGrid FmBalder Formation, top 2 164,0 mSele Formation, top 2 223,0 mLista Formation, top 2 276,5 mLista FmTy Formation, top 2 602,5 mEkofisk Formation, top 2 740,0 mJorsalfare Formation, top 2 792,0 mJorsalfare FmKyrre Formation, top 3 213,0 mTryggvason Formation, top 3 341,0 mTryggvason FmBlodøks Formation, top 3 672,5 mSvarte Formation, top 3 685,5 mSvarte FmSola Formation, top 3 858,5 mÅsgard Formation, top 3 875,0 mDraupne Formation, top 3 932,5 mIntra Draupne Fm Ss, top 4 072,5 mIntra Draupne Fm SsDraupne Formation, top 4 392,0 mIntra Draupne Fm Ss, top 4 473,5 m1321 0002 0003 0004 0004 592

Temperature

Reported at total depth145 °C
Drill-stem test at 4 183,0 m133 °C
Gudrun gradient32,6 °C/km
Estimated at total depth from the gradient149 °C

The gradient is the median of 4 released wells in Gudrun with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
15/3-1 S1,05 129,0-2,051974
15/3-U-11,9---2008
15/3-U-21,9---2008
15/3-A-11,96 648,0--2020
15/3-A-21,9901,0--2022
15/3-A-31,9---2026
15/3-A-41,9900,0--2020
15/3-U-41,9---2008

Casing and formation tests

The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.

StringCasingShoe, mHoleHole depth, mTest, g/cm³
Conductor30"179,036"179,0-
Surface casing20"1 001,026"1 010,01,50 LOT
Intermediate14"2 754,017 1/2"2 765,01,71 LOT
Intermediate9 7/8"3 910,012 1/4"3 910,02,12 LOT
Liner7"4 298,08 1/2"4 590,0-

Mud weight

12 measurements, one dot each, 1,00 to 1,62 g/cm³ against measured depth, glydril 12, paratherm, sw / bentonite 1.

1,01,21,41,601 0002 0003 0004 000151,0 m: 1,05 g/cm³, SW / BENTONITE 1182,0 m: 1,05 g/cm³, SW / BENTONITE 1955,0 m: 1,03 g/cm³, SW / BENTONITE 11 010,0 m: 1,30 g/cm³, SW / BENTONITE 11 617,0 m: 1,35 g/cm³, GLYDRIL 121 995,0 m: 1,36 g/cm³, GLYDRIL 122 800,0 m: 1,39 g/cm³, PARATHERM3 217,0 m: 1,45 g/cm³, PARATHERM3 510,0 m: 1,62 g/cm³, PARATHERM3 908,0 m: 1,62 g/cm³, PARATHERM3 910,0 m: 1,61 g/cm³, PARATHERM3 931,0 m: 1,03 g/cm³, PARATHERM

Drill-stem tests

Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.

TestInterval, mChokePressureTemp.OilGas
24 073,0 - 4 087,011,07,5130670-
14 141,0 - 4 183,012,77,0133733-
Show on the mapOpen on FactPages ↗