Fields / 15/3-U-6
15/3-U-6
Other, shallow gasPlugged and abandoned
Drilled by Statoil Petroleum AS with Transocean Leader, 18.05.2010 to 19.05.2010 (1 days), to 921,0 m.
Water depth108,0 m
Total depth921,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table23,5 m
Formation at total depth-
RigTransocean Leader
Spud18.05.2010
Completed19.05.2010
OperatorStatoil Petroleum AS
Position58,8207 N, 1,7724 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.