Fields / 15/5-3
15/5-3
Exploration, wildcatPlugged and abandonedShows
Drilled by Norsk Hydro Produksjon AS with Nortrym, 21.08.1980 to 07.12.1980 (108 days), to 5 042,0 m in the No Group Defined.
Water depth110,0 m
Total depth5 042,0 m MD
Vertical depth5 031,0 m TVD
Bottom-hole temperature142 °C
Max inclination8,0°
Rotary table25,0 m
Formation at total depthNo Group Defined
RigNortrym
Spud21.08.1980
Completed07.12.1980
OperatorNorsk Hydro Produksjon AS
Position58,7300 N, 1,6367 E
Formations
26 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 142 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 15/5-B-1 H | 0,5 | 2 376,0 | - | - | 2001 |
| 15/5-5 | 1,4 | 2 645,0 | 90 °C | 1,25 | 1995 |
| 15/5-A-7 AH | 2,0 | 4 122,0 | - | - | 2012 |
| 15/5-A-7 H | 2,0 | 4 360,0 | - | - | 2007 |
| 15/5-A-5 H | 2,3 | 3 840,0 | - | - | 2003 |
| 15/6-A-1 H | 2,6 | 3 891,0 | - | - | 2000 |
| 15/6-A-3 H | 2,6 | 4 225,0 | - | - | 2000 |
| 15/6-A-2 AH | 2,6 | 3 866,0 | - | - | 2000 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 198,0 | 36" | 198,0 | - |
| Surface casing | 20" | 605,0 | 26" | 605,0 | 1,44 LOT |
| Surface casing | 13 3/8" | 2 002,0 | 17 1/2" | 2 002,0 | 1,74 LOT |
| Intermediate | 9 5/8" | 3 525,0 | 12 1/4" | 3 525,0 | 2,01 LOT |
| Liner | 7" | 4 863,0 | 8 1/2" | 4 863,0 | 2,22 LOT |
| Open hole | - | 5 042,0 | 5 7/8" | 5 042,0 | - |
Mud weight
8 measurements, one dot each, 1,00 to 1,86 g/cm³ against measured depth, waterbased.