Fields / 15/6-14 S
15/6-14 S
Exploration, wildcatPluggedDry
Drilled by Statoil Petroleum AS with Maersk Integrator, 20.12.2017 to 26.12.2017 (6 days), to 4 684,0 m in the Sleipner Formation.
Water depth116,0 m
Total depth4 684,0 m MD
Vertical depth3 916,0 m TVD
Bottom-hole temperature-
Max inclination50,9°
Rotary table65,5 m
Formation at total depthSleipner Formation
RigMaersk Integrator
Spud20.12.2017
Completed26.12.2017
OperatorStatoil Petroleum AS
Position58,5722 N, 1,6968 E
Formations
13 tops reported, measured depth in metres.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 15/6-B-3 | 0,0 | 7 167,0 | - | - | 2018 |
| 15/6-B-4 | 0,0 | 6 200,0 | - | - | 2018 |
| 15/6-B-2 | 0,0 | 6 383,0 | - | - | 2016 |
| 15/6-B-2 A | 0,0 | 7 250,0 | - | - | 2018 |
| 15/6-B-1 | 0,0 | 6 035,0 | - | - | 2018 |
| 15/6-B-1 A | 0,0 | - | - | - | - |
| 15/6-B-5 | 0,0 | 5 645,0 | - | - | 2019 |
| 15/6-B-5 A | 0,0 | 6 770,0 | - | - | 2023 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 328,0 | 36" | 330,0 | - |
| Surface casing | 20" | 1 087,6 | 26" | 1 090,0 | 1,58 FIT |
| Intermediate | 13 5/8" | 3 334,2 | 17 1/2" | 3 340,0 | 1,65 FIT |
| Open hole | - | 4 684,0 | 8 1/2" | 4 684,0 | - |
Mud weight
11 measurements, one dot each, 1,40 to 1,60 g/cm³ against measured depth, innovert.