WellplannerNorwegian shelf well data

Fields / 15/6-18 S

15/6-18 S

Exploration, appraisalPlugged and abandonedDry

Drilled by Aker BP ASA with Deepsea Nordkapp, 27.09.2026 to 22.10.2026 (25 days), to 3 800,0 m.

Water depth111,0 m
Total depth3 800,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table32,6 m
Formation at total depth-
RigDeepsea Nordkapp
Spud27.09.2026
Completed22.10.2026
OperatorAker BP ASA
Position58,7070 N, 1,8364 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-

The wellbore is not in a field, so no field gradient applies.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
15/6-U-70,01 301,0--2026
15/6-102,83 700,0119 °C1,512009
15/6-154,03 795,0-1,502019
15/6-U-54,01 390,0--2019
15/6-16 S8,04 203,0-1,852019
15/6-U-48,01 130,0--2019
15/3-68,82 793,0-1,311998
15/3-58,94 130,0115 °C1,701983

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗