Fields / 15/6-U-2
15/6-U-2
Other, unknownPlugged and abandoned
Drilled by Esso Exploration and Production Norway A/S with Mariner, 11.10.1974 to 16.10.1974 (5 days), to 222,0 m.
Water depth113,0 m
Total depth222,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table-
Formation at total depth-
RigMariner
Spud11.10.1974
Completed16.10.1974
OperatorEsso Exploration and Production Norway A/S
Position58,4831 N, 1,7189 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 15/9-3 | 1,5 | 3 796,0 | 107 °C | 1,45 | 1978 |
| 15/9-E-4 AH | 1,6 | 5 101,0 | - | - | 2021 |
| 15/9-E-4 H | 1,6 | 4 409,0 | - | - | 2004 |
| 15/9-E-1 H | 1,6 | 4 018,0 | - | - | 2003 |
| 15/9-U-13 | 1,6 | 814,0 | - | - | 2003 |
| 15/9-E-2 AH | 1,6 | 4 266,0 | - | - | 2026 |
| 15/9-E-2 H | 1,6 | 4 518,0 | - | - | 2003 |
| 15/9-E-3 H | 1,6 | 3 745,0 | - | - | 2003 |
Casing and formation tests
No casing programme is reported for this wellbore.