Fields / Sleipner Vest / 15/9-E-4 H
15/9-E-4 H
Development, productionPluggedGas
Drilled by Statoil ASA (old) with Transocean Searcher in Sleipner Vest, 01.02.2004 to 19.03.2004 (47 days), to 4 409,0 m.
Water depth111,0 m
Total depth4 409,0 m MD
Vertical depth3 640,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table22,0 m
Formation at total depth-
RigTransocean Searcher
Spud01.02.2004
Completed19.03.2004
OperatorStatoil ASA (old)
Position58,4969 N, 1,7227 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Sleipner Vest gradient | 30,0 °C/km |
| Estimated at total depth from the gradient | 109 °C |
The gradient is the median of 13 released wells in Sleipner Vest with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 15/9-E-4 AH same well | 0,0 | 5 101,0 | - | - | 2021 |
| 15/9-E-1 H | 0,0 | 4 018,0 | - | - | 2003 |
| 15/9-U-13 | 0,0 | 814,0 | - | - | 2003 |
| 15/9-E-2 AH | 0,0 | 4 266,0 | - | - | 2026 |
| 15/9-E-2 H | 0,0 | 4 518,0 | - | - | 2003 |
| 15/9-E-3 H | 0,0 | 3 745,0 | - | - | 2003 |
| 15/6-3 | 1,1 | 3 795,0 | 106 °C | - | 1974 |
| 15/6-U-2 | 1,6 | 222,0 | - | - | 1974 |
Casing and formation tests
No casing programme is reported for this wellbore.