Fields / 15/8-2
15/8-2
Exploration, wildcatPlugged and abandonedDry
Drilled by Statoil Petroleum AS with COSLPioneer, 20.08.2011 to 21.10.2011 (62 days), to 4 386,0 m in the Sleipner Formation.
Water depth119,0 m
Total depth4 386,0 m MD
Vertical depth4 382,5 m TVD
Bottom-hole temperature143 °C
Max inclination8,7°
Rotary table25,0 m
Formation at total depthSleipner Formation
RigCOSLPioneer
Spud20.08.2011
Completed21.10.2011
OperatorStatoil Petroleum AS
Position58,4153 N, 1,5472 E
Formations
25 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 143 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 15/8-G-4 AH | 5,4 | 5 014,0 | - | - | 2025 |
| 15/8-G-4 H | 5,4 | 4 445,0 | - | - | 2018 |
| 15/8-G-1 AH | 5,4 | 4 070,0 | - | - | 2023 |
| 15/8-G-1 H | 5,4 | 3 950,0 | - | - | 2018 |
| 15/8-1 | 6,0 | 4 300,0 | 141 °C | 1,38 | 1981 |
| 15/9-2 | 9,4 | 3 764,0 | 107 °C | 1,35 | 1978 |
| 15/9-6 | 9,5 | 3 946,0 | 107 °C | 1,45 | 1980 |
| 15/9-5 | 9,5 | 3 946,0 | 131 °C | 1,40 | 1979 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 204,5 | 36" | 209,0 | - |
| Pilot hole | - | 1 100,0 | 9 7/8" | 1 100,0 | - |
| Surface casing | 20" | 1 127,7 | 26" | 1 133,0 | 1,44 LOT |
| Intermediate | 13 3/8" | 2 409,8 | 17 1/2" | 2 419,0 | 1,72 LOT |
| Intermediate | 9 5/8" | 3 708,0 | 12 1/4" | 3 708,0 | 1,55 LOT |
| Open hole | - | 4 386,0 | 8 1/2" | 4 386,0 | - |
Mud weight
14 measurements, one dot each, 1,20 to 1,41 g/cm³ against measured depth, glydril, spud mud, versatec.