15/8-G-1 AH
Development, productionClosedGas and condensate
Drilled by Equinor Energy AS with Transocean Enabler in Utgard, 22.12.2023 to 29.01.2024 (38 days), to 4 070,0 m.
Water depth115,0 m
Total depth4 070,0 m MD
Vertical depth3 783,1 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table32,1 m
Formation at total depth-
RigTransocean Enabler
Spud22.12.2023
Completed29.01.2024
OperatorEquinor Energy AS
Position58,3667 N, 1,5505 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
1 released well in Utgard report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 15/8-G-1 H same well | 0,0 | 3 950,0 | - | - | 2018 |
| 15/8-G-4 AH | 0,0 | 5 014,0 | - | - | 2025 |
| 15/8-G-4 H | 0,0 | 4 445,0 | - | - | 2018 |
| 15/8-1 | 1,4 | 4 300,0 | 141 °C | 1,38 | 1981 |
| 15/8-3 S | 4,7 | 4 359,0 | - | - | 2025 |
| 15/8-2 | 5,4 | 4 386,0 | 143 °C | 1,41 | 2011 |
| 15/9-22 | 8,0 | 3 923,0 | 142 °C | 1,35 | 2006 |
| 15/9-7 | 9,6 | 3 776,0 | 127 °C | 1,50 | 1980 |
Casing and formation tests
No casing programme is reported for this wellbore.