Fields / 15/8-3 S
15/8-3 S
Exploration, wildcatPlugged and abandonedGas and condensate
Drilled by Equinor Energy AS with Deepsea Atlantic, 11.12.2025 to 16.01.2026 (36 days), to 4 359,0 m.
Water depth110,0 m
Total depth4 359,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table30,0 m
Formation at total depth-
RigDeepsea Atlantic
Spud11.12.2025
Completed16.01.2026
OperatorEquinor Energy AS
Position58,3313 N, 1,5930 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 15/8-1 | 3,8 | 4 300,0 | 141 °C | 1,38 | 1981 |
| 15/8-G-1 AH | 4,7 | 4 070,0 | - | - | 2023 |
| 15/8-G-1 H | 4,7 | 3 950,0 | - | - | 2018 |
| 15/8-G-4 AH | 4,7 | 5 014,0 | - | - | 2025 |
| 15/8-G-4 H | 4,7 | 4 445,0 | - | - | 2018 |
| 15/9-22 | 5,4 | 3 923,0 | 142 °C | 1,35 | 2006 |
| 15/9-14 | 7,4 | 3 563,0 | 106 °C | 1,38 | 1982 |
| 15/9-7 | 9,0 | 3 776,0 | 127 °C | 1,50 | 1980 |
Casing and formation tests
No casing programme is reported for this wellbore.