Fields / Sleipner Øst / 15/9-17 R
15/9-17 R
Exploration, wildcatPlugged and abandonedGas and condensate
Drilled by Den norske stats oljeselskap a.s with Ross Rig (2) in Sleipner Øst, 28.04.1991 to 04.05.1991 (6 days), to 3 123,0 m in the Smith Bank Formation.
Water depth85,0 m
Total depth3 123,0 m MD
Vertical depth3 119,0 m TVD
Bottom-hole temperature-
Max inclination1,5°
Rotary table25,0 m
Formation at total depthSmith Bank Formation
RigRoss Rig (2)
Spud28.04.1991
Completed04.05.1991
OperatorDen norske stats oljeselskap a.s
Position58,4456 N, 1,9482 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Sleipner Øst gradient | 27,4 °C/km |
| Estimated at total depth from the gradient | 87 °C |
The gradient is the median of 5 released wells in Sleipner Øst with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 15/9-17 same well | 0,0 | 3 120,0 | 108 °C | 1,35 | 1982 |
| 15/9-19 A | 1,5 | 4 131,0 | 117 °C | 1,55 | 1997 |
| 15/9-19 B | 1,5 | 4 250,0 | 119 °C | 1,55 | 1997 |
| 15/9-19 S | 1,5 | 3 580,0 | - | 1,50 | 1992 |
| 15/9-19 SR | 1,5 | 4 641,0 | - | - | 1993 |
| 15/9-19 SR2 | 1,5 | 4 644,0 | - | - | 1997 |
| 15/9-C-2 AH | 1,5 | 3 254,0 | - | - | 1998 |
| 15/9-C-2 H | 1,5 | 2 990,0 | - | - | 1992 |
Casing and formation tests
No casing programme is reported for this wellbore.