WellplannerNorwegian shelf well data

Fields / Gungne / 15/9-A-2

15/9-A-2

Development, productionClosedGas

Drilled by Den norske stats oljeselskap a.s with Sleipner A in Gungne, 30.08.1995 to 06.02.1996 (160 days), to 8 561,0 m.

Water depth82,0 m
Total depth8 561,0 m MD
Vertical depth2 886,2 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table78,0 m
Formation at total depth-
RigSleipner A
Spud30.08.1995
Completed06.02.1996
OperatorDen norske stats oljeselskap a.s
Position58,3674 N, 1,9083 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-

1 released well in Gungne report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
15/9-A-30,07 743,0--2000
15/9-A-10,0----
15/9-A-60,02 884,0--1993
15/9-A-70,03 168,0--2001
15/9-A-50,03 510,0--1994
15/9-A-40,04 780,0--2000
15/9-A-80,03 650,0--1995
15/9-A-100,02 648,0--1993

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗