15/9-A-3
Development, productionProducingGas
Drilled by Den norske stats oljeselskap a.s with Sleipner A in Gungne, 19.05.2000 to 09.01.2001 (235 days), to 7 743,0 m.
Water depth82,0 m
Total depth7 743,0 m MD
Vertical depth3 017,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table78,0 m
Formation at total depth-
RigSleipner A
Spud19.05.2000
Completed09.01.2001
OperatorDen norske stats oljeselskap a.s
Position58,3674 N, 1,9083 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
1 released well in Gungne report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.