Fields / Sleipner Øst / 15/9-A-21
15/9-A-21
Development, productionClosedGas
Drilled by Den norske stats oljeselskap a.s with Sleipner A in Sleipner Øst, 09.11.1994 to 27.12.1994 (48 days), to 3 699,0 m.
Water depth82,0 m
Total depth3 699,0 m MD
Vertical depth2 488,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table78,0 m
Formation at total depth-
RigSleipner A
Spud09.11.1994
Completed27.12.1994
OperatorDen norske stats oljeselskap a.s
Position58,3672 N, 1,9089 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Sleipner Øst gradient | 27,4 °C/km |
| Estimated at total depth from the gradient | 68 °C |
The gradient is the median of 5 released wells in Sleipner Øst with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.