WellplannerNorwegian shelf well data

Fields / Sleipner Øst / 15/9-A-25

15/9-A-25

Development, productionClosedGas

Drilled by Statoil ASA (old) with Sleipner A in Sleipner Øst, 07.07.2001 to 05.09.2001 (60 days), to 4 973,0 m.

Water depth82,0 m
Total depth4 973,0 m MD
Vertical depth2 906,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table78,0 m
Formation at total depth-
RigSleipner A
Spud07.07.2001
Completed05.09.2001
OperatorStatoil ASA (old)
Position58,3672 N, 1,9089 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Sleipner Øst gradient27,4 °C/km
Estimated at total depth from the gradient79 °C

The gradient is the median of 5 released wells in Sleipner Øst with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
15/9-20 S0,03 626,0-1,641994
15/9-A-260,02 864,0--1994
15/9-A-210,03 699,0--1994
15/9-A-220,03 626,0--1994
15/9-A-22 A0,0----
15/9-A-270,03 110,0--1994
15/9-A-170,0----
15/9-A-230,05 590,0--1996

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗