Fields / Sleipner Øst / 15/9-A-25
15/9-A-25
Development, productionClosedGas
Drilled by Statoil ASA (old) with Sleipner A in Sleipner Øst, 07.07.2001 to 05.09.2001 (60 days), to 4 973,0 m.
Water depth82,0 m
Total depth4 973,0 m MD
Vertical depth2 906,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table78,0 m
Formation at total depth-
RigSleipner A
Spud07.07.2001
Completed05.09.2001
OperatorStatoil ASA (old)
Position58,3672 N, 1,9089 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Sleipner Øst gradient | 27,4 °C/km |
| Estimated at total depth from the gradient | 79 °C |
The gradient is the median of 5 released wells in Sleipner Øst with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.