WellplannerNorwegian shelf well data

Fields / Sleipner Vest / 15/9-B-20

15/9-B-20

Development, productionPluggedGas

Drilled by Den norske stats oljeselskap a.s with West Epsilon in Sleipner Vest, 28.01.1999 to 19.06.1999 (142 days), to 6 003,0 m.

Water depth108,0 m
Total depth6 003,0 m MD
Vertical depth3 626,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table48,0 m
Formation at total depth-
RigWest Epsilon
Spud28.01.1999
Completed19.06.1999
OperatorDen norske stats oljeselskap a.s
Position58,4179 N, 1,7180 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Sleipner Vest gradient30,0 °C/km
Estimated at total depth from the gradient108 °C

The gradient is the median of 13 released wells in Sleipner Vest with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
15/9-B-20 A same well0,06 589,0--2017
15/9-B-240,07 020,0--1996
15/9-B-190,0----
15/9-B-160,06 419,0--2018
15/9-21 S0,05 126,0--1998
15/9-B-230,07 354,0--2025
15/9-B-150,0----
15/9-B-180,0----

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗