Fields / Sleipner Vest / 15/9-B-23
15/9-B-23
Development, productionProducingGas
Drilled by Equinor Energy AS with Shelf Drilling Barsk in Sleipner Vest, 28.09.2025 to 03.01.2026 (97 days), to 7 354,0 m.
Water depth107,7 m
Total depth7 354,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table58,1 m
Formation at total depth-
RigShelf Drilling Barsk
Spud28.09.2025
Completed03.01.2026
OperatorEquinor Energy AS
Position58,4179 N, 1,7180 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Sleipner Vest gradient | 30,0 °C/km |
| Estimated at total depth from the gradient | 219 °C |
The gradient is the median of 13 released wells in Sleipner Vest with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 15/9-B-19 | 0,0 | - | - | - | - |
| 15/9-B-24 | 0,0 | 7 020,0 | - | - | 1996 |
| 15/9-B-22 | 0,0 | 8 306,0 | - | - | 1997 |
| 15/9-B-22 A | 0,0 | 6 681,0 | - | - | 1998 |
| 15/9-B-20 | 0,0 | 6 003,0 | - | - | 1999 |
| 15/9-B-20 A | 0,0 | 6 589,0 | - | - | 2017 |
| 15/9-B-18 | 0,0 | - | - | - | - |
| 15/9-B-15 | 0,0 | - | - | - | - |
Casing and formation tests
No casing programme is reported for this wellbore.