WellplannerNorwegian shelf well data

Fields / Sleipner Vest / 15/9-B-22 A

15/9-B-22 A

Development, productionClosedGas

Drilled by Den norske stats oljeselskap a.s with West Epsilon in Sleipner Vest, 02.12.1998 to 10.01.1999 (39 days), to 6 681,0 m.

Water depth108,0 m
Total depth6 681,0 m MD
Vertical depth3 666,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table48,0 m
Formation at total depth-
RigWest Epsilon
Spud02.12.1998
Completed10.01.1999
OperatorDen norske stats oljeselskap a.s
Position58,4179 N, 1,7179 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Sleipner Vest gradient30,0 °C/km
Estimated at total depth from the gradient109 °C

The gradient is the median of 13 released wells in Sleipner Vest with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
15/9-B-22 same well0,08 306,0--1997
15/9-B-210,03 786,0--2000
15/9-B-230,07 354,0--2025
15/9-B-180,0----
15/9-B-190,0----
15/9-B-140,03 888,0--1995
15/9-B-240,07 020,0--1996
15/9-B-200,06 003,0--1999

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗