16/1-30 A
Exploration, appraisalPlugged and abandonedOil
Drilled by Equinor Energy AS with West Phoenix in Symra, 02.07.2019 to 19.07.2019 (17 days), to 2 075,0 m in the Basement.
Water depth114,0 m
Total depth2 075,0 m MD
Vertical depth1 990,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table38,6 m
Formation at total depthBasement
RigWest Phoenix
Spud02.07.2019
Completed19.07.2019
OperatorEquinor Energy AS
Position58,9808 N, 2,2808 E
Formations
18 tops reported, measured depth in metres.
Temperature
| Reported at total depth | - |
| Symra gradient | 45,7 °C/km |
| Estimated at total depth from the gradient | 88 °C |
The gradient is the median of 3 released wells in Symra with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 16/1-30 S same well | 0,0 | 2 140,0 | 88 °C | 1,35 | 2019 |
| 16/1-EA-2 H | 1,2 | 2 990,0 | - | - | 2025 |
| 16/1-EA-3 H | 1,2 | 2 880,0 | - | - | 2025 |
| 16/1-EA-1 Y1H | 1,2 | 5 094,0 | - | - | 2026 |
| 16/1-EA-1 Y2H | 1,2 | 4 800,0 | - | - | 2026 |
| 16/1-EA-1 Y3H | 1,2 | - | - | - | - |
| 16/1-EA-4 AH | 1,2 | 4 374,0 | - | - | 2026 |
| 16/1-EA-4 H | 1,2 | 3 860,0 | - | - | 2025 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 36" | 202,0 | 42" | 203,0 | - |
| Surface casing | 20" | 567,0 | 36" | 572,0 | - |
| Intermediate | 13 3/8" | 1 300,0 | 16" | 1 301,0 | 1,55 FIT |
| Liner | 9 5/8" | 1 977,0 | 12 1/4" | 1 978,0 | 1,92 LOT |
| Open hole | - | 2 075,0 | 8 1/2" | 2 075,0 | - |
Mud weight
3 measurements, one dot each, 1,00 to 1,09 g/cm³ against measured depth, versatec.