16/1-EA-2 H
Development, productionProducingOil
Drilled by Aker BP ASA with Deepsea Nordkapp in Symra, 17.07.2025 to 31.10.2025 (106 days), to 2 990,0 m.
Water depth115,6 m
Total depth2 990,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table32,6 m
Formation at total depth-
RigDeepsea Nordkapp
Spud17.07.2025
Completed31.10.2025
OperatorAker BP ASA
Position58,9700 N, 2,2834 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Symra gradient | 45,7 °C/km |
| Estimated at total depth from the gradient | 134 °C |
The gradient is the median of 3 released wells in Symra with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 16/1-EA-1 Y1H | 0,0 | 5 094,0 | - | - | 2026 |
| 16/1-EA-1 Y2H | 0,0 | 4 800,0 | - | - | 2026 |
| 16/1-EA-1 Y3H | 0,0 | - | - | - | - |
| 16/1-EA-3 H | 0,0 | 2 880,0 | - | - | 2025 |
| 16/1-EA-4 AH | 0,0 | 4 374,0 | - | - | 2026 |
| 16/1-EA-4 H | 0,0 | 3 860,0 | - | - | 2025 |
| 16/1-U-12 | 0,1 | - | - | - | - |
| 16/1-29 S | 0,8 | 2 024,0 | 100 °C | 1,28 | 2018 |
Casing and formation tests
No casing programme is reported for this wellbore.