Fields / Ivar Aasen / 16/1-D-2
16/1-D-2
Development, injectionInjectingWater
Drilled by Aker BP ASA with Maersk Interceptor in Ivar Aasen, 12.04.2017 to 30.04.2017 (18 days), to 4 582,0 m.
Water depth112,7 m
Total depth4 582,0 m MD
Vertical depth2 664,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table68,2 m
Formation at total depth-
RigMaersk Interceptor
Spud12.04.2017
Completed30.04.2017
OperatorAker BP ASA
Position58,9223 N, 2,1981 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ivar Aasen gradient | 39,1 °C/km |
| Estimated at total depth from the gradient | 101 °C |
The gradient is the median of 6 released wells in Ivar Aasen with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 16/1-D-3 | 0,0 | 3 545,0 | - | - | 2017 |
| 16/1-D-1 | 0,0 | 3 524,0 | - | - | 2015 |
| 16/1-D-6 | 0,0 | 3 826,0 | - | - | 2018 |
| 16/1-D-6 A | 0,0 | 3 910,0 | - | - | 2018 |
| 16/1-D-6 B | 0,0 | 5 123,0 | - | - | 2018 |
| 16/1-D-6 C | 0,0 | - | - | - | - |
| 16/1-D-7 | 0,0 | 5 353,0 | - | - | 2018 |
| 16/1-D-5 | 0,0 | 4 077,0 | - | - | 2017 |
Casing and formation tests
No casing programme is reported for this wellbore.