Fields / Ivar Aasen / 16/1-D-3
16/1-D-3
Development, injectionInjectingWater
Drilled by Aker BP ASA with Maersk Interceptor in Ivar Aasen, 05.06.2017 to 17.06.2017 (12 days), to 3 545,0 m.
Water depth112,7 m
Total depth3 545,0 m MD
Vertical depth2 675,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table68,3 m
Formation at total depth-
RigMaersk Interceptor
Spud05.06.2017
Completed17.06.2017
OperatorAker BP ASA
Position58,9223 N, 2,1981 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ivar Aasen gradient | 39,1 °C/km |
| Estimated at total depth from the gradient | 101 °C |
The gradient is the median of 6 released wells in Ivar Aasen with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 16/1-D-2 | 0,0 | 4 582,0 | - | - | 2017 |
| 16/1-D-7 | 0,0 | 5 353,0 | - | - | 2018 |
| 16/1-D-4 | 0,0 | 4 514,0 | - | - | 2016 |
| 16/1-D-4 A | 0,0 | 4 137,0 | - | - | 2021 |
| 16/1-D-6 | 0,0 | 3 826,0 | - | - | 2018 |
| 16/1-D-6 A | 0,0 | 3 910,0 | - | - | 2018 |
| 16/1-D-6 B | 0,0 | 5 123,0 | - | - | 2018 |
| 16/1-D-6 C | 0,0 | - | - | - | - |
Casing and formation tests
No casing programme is reported for this wellbore.