Fields / Ivar Aasen / 16/1-D-4 A

16/1-D-4 A

Development, injectionInjectingWater

Drilled by Aker BP ASA with Maersk Integrator in Ivar Aasen, 05.09.2021 to 13.09.2021 (8 days), to 4 137,0 m.

Water depth112,7 m
Total depth4 137,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table68,2 m
Formation at total depth-
RigMaersk Integrator
Spud05.09.2021
Completed13.09.2021
OperatorAker BP ASA
Position58,9223 N, 2,1981 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Ivar Aasen gradient39,1 °C/km
Estimated at total depth from the gradient158 °C

The gradient is the median of 6 released wells in Ivar Aasen with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
16/1-D-4 same well0,04 514,0--2016
16/1-D-80,04 222,0--2016
16/1-D-8 A0,03 655,0--2022
16/1-D-8 B0,03 472,0--2022
16/1-D-8 C0,03 898,0--2022
16/1-D-8 D0,0----
16/1-D-30,03 545,0--2017
16/1-D-70,05 353,0--2018

Casing and formation tests

No casing programme is reported for this wellbore.