Fields / 16/10-1
16/10-1
Exploration, wildcatPlugged and abandonedDry
Drilled by Norsk Agip AS with Dyvi Stena, 25.05.1986 to 14.07.1986 (50 days), to 3 151,0 m in the Zechstein Group.
Water depth84,0 m
Total depth3 151,0 m MD
Vertical depth3 151,0 m TVD
Bottom-hole temperature123 °C
Max inclination-
Rotary table25,0 m
Formation at total depthZechstein Group
RigDyvi Stena
Spud25.05.1986
Completed14.07.1986
OperatorNorsk Agip AS
Position58,0566 N, 2,0539 E
Formations
27 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 123 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 15/12-8 | 5,1 | 3 054,0 | 120 °C | 1,53 | 1991 |
| 15/12-8 A | 5,1 | 2 940,0 | 123 °C | 1,35 | 1991 |
| 15/12-7 S | 6,6 | 3 570,0 | 128 °C | 1,60 | 1990 |
| 16/10-U-3 | 7,7 | 126,2 | - | - | 2012 |
| 16/10-U-4 | 7,7 | 119,6 | - | - | 2012 |
| 16/10-5 | 7,7 | 3 034,0 | - | 1,58 | 2012 |
| 7/1-U-1 | 7,7 | - | - | - | 2012 |
| 16/10-U-2 | 7,8 | 115,4 | - | - | 2012 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 195,0 | 36" | 195,0 | - |
| Surface casing | 20" | 505,0 | 26" | 522,0 | 1,61 LOT |
| Intermediate | 13 3/8" | 1 409,0 | 17 1/2" | 1 424,0 | 1,82 LOT |
| Intermediate | 9 5/8" | 2 540,0 | 12 1/4" | 2 565,0 | 1,82 LOT |
| Open hole | - | 3 151,0 | 8 1/2" | 3 151,0 | - |
Mud weight
50 measurements, one dot each, 1,00 to 1,42 g/cm³ against measured depth, water based, waterbased.