Fields / 16/10-U-2
16/10-U-2
Other, soil drillingPlugged and abandoned
Drilled by Talisman Energy Norge AS with Bucentaur, 16.04.2012 to 17.04.2012 (1 days), to 115,4 m.
Water depth83,0 m
Total depth115,4 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table2,9 m
Formation at total depth-
RigBucentaur
Spud16.04.2012
Completed17.04.2012
OperatorTalisman Energy Norge AS
Position58,0004 N, 2,1326 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.