WellplannerNorwegian shelf well data

Fields / Johan Sverdrup / 16/3-P-1 H

16/3-P-1 H

Development, injectionInjectingWater and gas

Drilled by Equinor Energy AS with Deepsea Atlantic in Johan Sverdrup, 26.01.2022 to 27.03.2023 (425 days), to 4 036,0 m.

Water depth116,0 m
Total depth4 036,0 m MD
Vertical depth1 971,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table30,0 m
Formation at total depth-
RigDeepsea Atlantic
Spud26.01.2022
Completed27.03.2023
OperatorEquinor Energy AS
Position58,8068 N, 2,7105 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Johan Sverdrup gradient43,0 °C/km
Estimated at total depth from the gradient82 °C

The gradient is the median of 20 released wells in Johan Sverdrup with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
16/3-P-2 H0,03 925,0--2022
16/3-P-3 H0,04 093,0--2026
16/3-P-4 H0,03 414,0--2022
16/3-40,62 020,087 °C1,302011
16/3-4 A0,62 128,0-1,372011
16/3-61,42 050,0-1,502013
16/3-O-2 H1,83 200,0--2022
16/3-O-1 H1,81 701,0--2024

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗