Exploration, wildcatPlugged and abandonedGas and condensate

Drilled by Statoil Petroleum AS with Ocean Vanguard, 09.07.2011 to 13.09.2011 (66 days), to 2 514,0 m in the Tor Formation.

Water depth85,0 m
Total depth2 514,0 m MD
Vertical depth2 513,0 m TVD
Bottom-hole temperature-
Max inclination6,4°
Rotary table22,0 m
Formation at total depthTor Formation
RigOcean Vanguard
Spud09.07.2011
Completed13.09.2011
OperatorStatoil Petroleum AS
Position58,4990 N, 2,0254 E

Formations

16 tops reported, measured depth in metres.

GroupsNordland Group, top 107,0 mNordland GpHordaland Group, top 1 106,5 mHordaland GpRogaland Group, top 2 172,0 mRogaland GpShetland Group, top 2 466,5 mFormationsUtsira Formation, top 793,0 mUtsira FmSkade Formation, top 1 397,5 mNo Formal Name, top 1 413,5 mNo Formal NameGrid Formation, top 1 951,0 mNo Formal Name, top 2 001,5 mNo Formal NameBalder Formation, top 2 172,0 mSele Formation, top 2 217,0 mLista Formation, top 2 264,0 mVåle Formation, top 2 335,0 mTy Formation, top 2 348,5 mTy FmEkofisk Formation, top 2 466,5 mTor Formation, top 2 499,5 m1075001 0001 5002 0002 5002 530

Temperature

Reported at total depth-

The wellbore is not in a field, so no field gradient applies.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
16/7-U-10,0610,0--2011
16/7-22,83 146,097 °C1,341982
15/9-U-173,3----
15/9-U-143,3----
15/9-253,32 932,0109 °C1,502024
15/9-U-163,3----
15/9-U-153,3----
15/9-177,43 120,0108 °C1,351982

Casing and formation tests

The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.

StringCasingShoe, mHoleHole depth, mTest, g/cm³
Conductor30"172,036"172,0-
Surface casing20"497,026"503,01,46 LOT
Pilot hole-610,08 1/2"610,0-
Intermediate13 3/8"1 151,017 1/2"1 151,01,76 LOT
Intermediate9 5/8"1 905,012 1/4"2 265,0-
Liner7"2 282,08 1/2"2 282,01,35 LOT
Open hole-2 514,06"2 514,0-

Mud weight

15 measurements, one dot each, 1,00 to 1,47 g/cm³ against measured depth, performadril, spud mud, xp-07 - #14.

1,01,11,21,31,41,505001 0001 5002 0002 500150,0 m: 1,03 g/cm³, Spud Mud347,0 m: 1,33 g/cm³, Spud Mud487,0 m: 1,31 g/cm³, Spud Mud503,0 m: 1,24 g/cm³, Performadril1 160,0 m: 1,30 g/cm³, Performadril1 180,0 m: 1,18 g/cm³, XP-07 - #141 906,0 m: 1,45 g/cm³, XP-07 - #141 944,0 m: 1,45 g/cm³, XP-07 - #142 072,0 m: 1,31 g/cm³, Spud Mud2 072,0 m: 1,30 g/cm³, Spud Mud2 278,0 m: 1,35 g/cm³, XP-07 - #142 278,0 m: 1,35 g/cm³, XP-07 - #142 283,0 m: 1,47 g/cm³, XP-07 - #142 514,0 m: 1,24 g/cm³, XP-07 - #142 514,0 m: 1,20 g/cm³, XP-07 - #14