16/7-4
Exploration, wildcatPlugged and abandonedGas and condensate
Drilled by Esso Exploration and Production Norway A/S with Glomar Biscay Ii in Sigyn, 15.10.1982 to 06.12.1982 (52 days), to 2 781,0 m in the Skagerrak Formation.
Formations
18 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 96 °C |
2 released wells in Sigyn report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 16/7-A-1 H | 1,1 | 4 399,0 | - | - | 2001 |
| 16/7-A-4 H | 1,1 | 3 440,0 | - | - | 2016 |
| 16/7-A-2 AH | 1,1 | 4 294,0 | - | - | 2026 |
| 16/7-A-2 H | 1,1 | 5 095,0 | - | - | 2002 |
| 16/7-A-3 AH | 1,1 | 3 524,0 | - | - | 2021 |
| 16/7-A-3 H | 1,1 | 3 123,0 | - | - | 2001 |
| 16/7-7 S | 2,3 | 2 994,0 | 112 °C | 1,56 | 1997 |
| 15/9-24 | 2,8 | 2 400,0 | - | 1,30 | 2010 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 165,0 | 36" | 165,0 | - |
| Surface casing | 20" | 458,0 | 26" | 473,0 | 1,62 LOT |
| Intermediate | 13 3/8" | 1 277,4 | 17 1/2" | 1 293,0 | 1,80 LOT |
| Intermediate | 9 5/8" | 2 271,0 | 12 1/4" | 2 286,0 | 1,87 LOT |
| Liner | 7" | 2 776,0 | 8 1/2" | 2 781,0 | - |
Mud weight
8 measurements, one dot each, 1,00 to 1,40 g/cm³ against measured depth, seawa/gel, seawater.
Drill-stem tests
Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.
| Test | Interval, m | Choke | Pressure | Temp. | Oil | Gas |
|---|---|---|---|---|---|---|
| 2 | 2 525,0 - 2 535,0 | 16,7 | - | - | 253 | 472 890 |
| 1 | 2 590,0 - 2 597,0 | 16,7 | - | - | 199 | 385 110 |