16/7-A-2 AH
Development, productionClosedGas
Drilled by Equinor Energy AS with COSLPromoter in Sigyn, 15.09.2026 to 03.10.2026 (18 days), to 4 294,0 m.
Water depth78,6 m
Total depth4 294,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table25,1 m
Formation at total depth-
RigCOSLPromoter
Spud15.09.2026
Completed03.10.2026
OperatorEquinor Energy AS
Position58,2850 N, 2,0438 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
2 released wells in Sigyn report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 16/7-A-2 H same well | 0,0 | 5 095,0 | - | - | 2002 |
| 16/7-A-3 AH | 0,0 | 3 524,0 | - | - | 2021 |
| 16/7-A-3 H | 0,0 | 3 123,0 | - | - | 2001 |
| 16/7-A-1 H | 0,0 | 4 399,0 | - | - | 2001 |
| 16/7-A-4 H | 0,0 | 3 440,0 | - | - | 2016 |
| 16/7-4 | 1,1 | 2 781,0 | 96 °C | 1,40 | 1982 |
| 16/7-7 S | 1,2 | 2 994,0 | 112 °C | 1,56 | 1997 |
| 16/7-6 | 2,7 | 2 725,0 | 105 °C | 1,40 | 1997 |
Casing and formation tests
No casing programme is reported for this wellbore.